News
Where FLOT. is already greening sheet pile walls
From the first pilot with three attachment methods in Oudenbosch to scaling up to 195 metres of sheet pile wall and the latest pilot in the Theodorushaven.
From the first pilot with three attachment methods in Oudenbosch to scaling up to 195 metres of sheet pile wall and the latest pilot in the Theodorushaven.